North
County Reclaimed Water Distribution System, Phase 3A and 3B, Pinellas
County, FL
Project Engineer responsible for the design, permitting and construction
management of the North County Reclaimed Water Distribution System project.
This project will beneficially reuse reclaimed water through residential
irrigation and includes over 22 miles of reclaimed water piping, carrying
a peak flow of 10 mgd to approximately 2,000 residential units. The
pipelines will primarily be installed by horizontal directional drilling
methods. King is also providing pipeline route elevations, hydraulic
modeling, surveying, utility coordination, preparation of contract documents,
and bidding phase services.
South
County Solid Waste Transfer Station Expansion, Hillsborough County,
FL
Project Engineer for the expansion and reconstruction of this solid
waste transfer station. The project includes evaluation of current tonnages
and projections of future tonnages through the year 2025, preliminary
engineering and planning, site plan development, and design, permitting,
and construction of a new 1,000 ton per day facility using top load
technology. Ancillary facilities include leachate collection and storage,
a new scale house facility, a maintenance building, trailer parking
and washing facilities, a new existing community collection center,
and expansion of an existing yard and wood waste processing facility.
Northwest
Solid Waste Transfer Station Expansion, Hillsborough County
Project Engineer for the expansion and reconstruction of this solid
waste transfer station on a closed landfill. The project includes evaluation
of current tonnages and projections of future tonnages through the year
2025, preliminary engineering and planning, alternative site plan analyses,
and design, permitting and construction of a new 2,500 ton per day facility
using top load technology. Ancillary facilities include leachate collection
and storage, a new scale house facility, a maintenance building, trailer
parking and washing facilities, expansion of an existing community collection
center, and expansion of an existing yard and wood waste processing
facility.
Southeast
Water Treatment System, Pasco County, FL
Project Engineer for the design, permitting, and construction management
of approximately ±5.3 miles of potable water main and 3.1 miles of raw
water main as well as design, permitting, and construction services
related to implementation of a new 14 mgd water treatment pumping facility
in southeast Pasco County. The WTP will treat raw water from five existing
wells providing for chloramine disinfection, storage, and high service
pumping of the finished water. Responsibilities included quality control
of chloramine conversion design and high performance pump design.
Galvanized
Water Main Replacement Program, Pinellas County, FL
Project Engineer for the analysis, fire hydrant coverage evaluation,
design, route assessment, permitting, and construction management for
approximately 45 miles of replacement water mains for Pinellas County.
This was part of an overall 150-mile replacement program, in which King
was assigned 11 contracts to accomplish the tasks. Design included replacing
all 2-inch galvanized and cast iron water mains with 2-inch PVC water
main and larger, depending on hydraulics and fire hydrant spacing requirements.
Pinellas
County Standardized Technical Specification, Pinellas County, FL
Project Engineer for the standardization of Pinellas County's Master
Technical Specifications for utility construction. Responsibilities
involved analyzing existing specifications for redundancy and discrepancies
and reconfigured it into the CSI 2004 format.
Wet
Weather Assessment, Pasco County, FL
Engineer for updating current reclaimed water capacities of the existing
Master Reuse System, including tanks, golf course ponds, and rapid infiltration
basins. For those golf course ponds that contained both reclaimed and
stormwater, identified the tributary stormwater drainage area and determined
stormwater storage volume required for compliance with FDEP regulations.
Wiregrass
Ranch Reclaimed, Potable Water, and Wastewater System, Pasco County,
FL
Developed reclaimed water demands for Wiregrass Ranch, a development
with 1,200 residential units, commercial areas, and two golf courses
on 5,000 acres. Demands were derived for phasing as well as conceptual
build-out and then analyzed to identify infrastructure needs.
Stormwater
Management, Clinton County, PA
Assistant Project Manager for the development of a watershed-wide stormwater
management plan as mandated by Pennsylvania State's Stormwater Management
Act 167. Led committee meetings and public hearings, created regular
newsletters, helped local communities understand the implications of
Act 167, and edited watershed plan.
Legacy
Park, Hillsborough County, FL
Project Engineer for providing a master plan for the potable water and
fire protection for 372 new units of proposed housing. Hydraulic modeling
allowed for proper pipe sizing and creation of a system capable of providing
hydrant and sprinkler protection during peak hourly demand. This modeling
effort also accounted for future development demand, pressure drops
associated with the proposed development's backflow preventer and meter,
while highlighting existing water main source pressure issues that will
need to be rectified before inclusion of the new development into the
existing distribution system.
Publix
at Summerfield Crossings, Hillsborough County, FL
Engineer for Master Utility Plan for this 19-acre commercial development.
Design considered demand schedules, source pressures and line sizing
at peak demand plus fire flow for the proposed water distribution system.
Provided design for entire area's pump station, including hydraulic
analysis of local force main system and selection of pump and wet well
design.
Palma
Sola Trace, Bradenton, FL
Project Engineer for the design of a 4,870 lf force main, pump station,
and the refurbishment of a receiving manhole.
